Understanding and calculating the average wire path around a bobbin
The Mean Length of Turn (MLT) is the average length of wire needed for one complete turn around the bobbin. It's essential for calculating:
Cross-section looking down the core axis, so the core reads tongue × stack. The coil builds outward across the window width, T/2 each side — 0.375″ on an EI-75 — while the window height of 3T/2 is the traverse, running into the page.
The wire path starts as a rectangle around the core and bobbin. Each turn must go:
This gives the perimeter: 2 × (T + D + 2t)
As layers build up, the wire path gets longer. The average turn sits at the midpoint of the winding build. The corners effectively add a quarter-circle at each of the four corners, using the average build height as the radius.
Four quarter-circles = one full circle = 2π × (hbuild/2) = π × hbuild/2
Effective winding width = Window Height - 2 × Bobbin Wall
Effective width = 0.438" - 2 × 0.0625" = 0.438" - 0.125" = 0.313" Turns per layer = floor(0.313" / 0.0341") = floor(9.18) = 9 turns
Number of layers = ceil(180 / 9) = ceil(20) = 20 layers
Build height (hbuild) = 20 layers × 0.0341" = 0.682"
MLT = 2(T + D + 2t) + π(hbuild/2) = 2(0.875 + 1.0 + 2 × 0.0625) + π(0.682/2) = 2(0.875 + 1.0 + 0.125) + π(0.341) = 2(2.0) + 1.071 = 4.0 + 1.071 = 5.07"
Wire length = MLT × Turns = 5.07" × 180 = 912.6" = 76.1 feet
| Method | Formula | Result |
|---|---|---|
| Simplified (no bobbin, no build) | 2(T + D) | 3.75" |
| With bobbin walls | 2(T + D + 2t) | 4.00" |
| Full formula (with build) | 2(T + D + 2t) + π(h/2) | 5.07" |
Bobbin Wall Thickness: Typical values range from 0.0625" (1/16") for small bobbins to 0.125" (1/8") for larger ones. Thicker walls provide better insulation but reduce winding space.
Build Height Estimation: For random-wound coils, multiply the calculated build by a factor of 1.1-1.2 to account for imperfect layering. This increases the effective MLT.
Layer Insulation: If using layer insulation tape between winding layers, add the tape thickness to each layer height when calculating build.
First Layer Offset: The first layer sits directly on the bobbin, not at the average build height. For very few layers (1-3), a more detailed calculation may be warranted, but for typical multi-layer windings, the average approach is sufficiently accurate.